Bore well Tips
When borewell is cleaned the
permeability of the borewell is increased by removing fine materials
like sand, clay deposits and rock cuttings accumulated in borewells
and gravel packing provided around well screens. Usually it is done
by over pumping water in the borewell or flushing the borewell with
adequate air pressure.
In hard rock areas, flushing is done after the drilling process for at least 2-3 hours by using compressed air before drilling is stopped. Most of the drillers avoid this as it is an additional task. This is an important process that must be finally performed bef ore completion of the drilling process at any given site.
Well development is also carried out to borewells which are facing reduction in water yield over a period of time to increase its yield. The reduction in yield can be due to clogging of pores spaces by silt and mineral deposits. Flushing using air pressure or over pumping the borewell are the methods normally employed to improve the yield of such borewells.
So should be worth to clean the bore and yes, your bore will get affected but only for the betterment.
Also, your mechanic could be correct but to what extent that its one of the reason's for your current problem cannot be accurately gauged.
Having a filter at the delivery will definitely improve the situation even if its not completely eliminating the problem.
And sorry to say, but I fail to understand your motor side, may i ask you to elaborate your motor details please?
At this moment of time you wont be requiring us, all the people you need is
A)To pull out and drop in the pump when required
B)To clean the bore
C)To check casing pipe and increase if you speculate insufficient casing depth
But having said we can assist you technically on options by sending an engineer , but my advice is not to rush into things and incur expenses that could be avoided.
In hard rock areas, flushing is done after the drilling process for at least 2-3 hours by using compressed air before drilling is stopped. Most of the drillers avoid this as it is an additional task. This is an important process that must be finally performed bef ore completion of the drilling process at any given site.
Well development is also carried out to borewells which are facing reduction in water yield over a period of time to increase its yield. The reduction in yield can be due to clogging of pores spaces by silt and mineral deposits. Flushing using air pressure or over pumping the borewell are the methods normally employed to improve the yield of such borewells.
So should be worth to clean the bore and yes, your bore will get affected but only for the betterment.
Also, your mechanic could be correct but to what extent that its one of the reason's for your current problem cannot be accurately gauged.
Having a filter at the delivery will definitely improve the situation even if its not completely eliminating the problem.
And sorry to say, but I fail to understand your motor side, may i ask you to elaborate your motor details please?
At this moment of time you wont be requiring us, all the people you need is
A)To pull out and drop in the pump when required
B)To clean the bore
C)To check casing pipe and increase if you speculate insufficient casing depth
But having said we can assist you technically on options by sending an engineer , but my advice is not to rush into things and incur expenses that could be avoided.